CN EN
Guangsheng International Building
Project introduction
  • Honor
    2014-2015 China Construction Engineering Luban Prize
  • Contractor
    Guangzhou Construction Co., Ltd. and installed by Guangzhou Electromechanical Installation Co., Ltd.
The 312m-high disassembly technology for the MC200 internal tower crane and the installation technology for roof antenna mast steel structures are adopted in the project. They are technically difficult and complicated.